Thursday, 7 April 2011

List of equipment for the first day of filming

Outside the music building at 9:00 am and bring/have;

- No product in hair
- Dated clothes (shirt, tie, cardie)
- Packed lunch or money for Shops
- Old fashioned shoes or black pumps
- Sacks of coffee beans
- Tripod and video camera
- Slowmotion camera
- Science equipment
- Tables and stools
- Lab coats
- Dry shampoo
- Face paint/make-up
- Clock
- Hessian sack

No comments:

Post a Comment